Risk Assessment and Management Approach

We don't just provide architectural, engineering services, and project management – we are building a community!

RISK ASSESSMENT

It is the policy of JG-I that for every work task to be completed, the risk (probability + severity) is assessed/analyzed so that proper controls can be put into place to minimize and lower the risk of injury/illness. JG-I utilizes a combination of formal hazard assessment techniques and site-specific hazard assessment techniques.

Risk assessment is a vital component in ensuring on-site safety, helping to drive JG-I toward our ZERO ACCIDENT target.

Formal Hazard Assessments

JG-I field staff and all subcontractors are required to participate in Formal Hazard Assessments prior to start of a new job and as job conditions or scope of work is altered or new work tasks are added.

  • Pre-Job Hazard Assessment and Safety Meeting
  • Job Hazard Analysis for all JG-I Tasks

Site-Specific Hazard Assessment Methods

JG-I field staff and all subcontractors are required to complete Site-Specific Hazard Assessments prior to start of a new job and as job conditions or scope of work is altered, while on-site.

  • Daily Tailgate Meetings
  • Field Level Hazard Assessments (FLHA)

HAZARD CONTROLS

Once hazards are assessed and prioritized using JG-I's Risk Ranking Table and controls are put into place. JG-I follows the below guide/hierarchy for providing controls for hazards. These controls are listed below in order from MOST EFFECTIVE to LEAST EFFECTIVE:

Hierarchy of Controls

S - Personnel Safety

P - Business/Production

E - Environmental

D - Damage

H - HIGH RISKS
Unacceptable risk level. Actions are required to eliminate or reduce the risk immediately

M- MEDIUM RISKS
Risk controls are required

L - LOW RISKS
Acceptable risk (controls will still be justified)

4. Not Applicable4A4B4C4D
3. Minor3A3B3C3D
2. Serious2A2B2C2D
1. Imminent Danger1A1B1C1D
A. ProbableB. Reasonably ProbableC. RemoteD. Extremely Remote
RATINGSEVERITYPROBABILITY
HIGHIMMINENT / SERIOUSPROBABLE / REASONABLY PROBABLE
1A, 1B, 2A, 2BS - Disabling injury, loss of body or fatality, lost time incident.Repetitive event
P - Loss of function of facility for extended eriods, with business consequences, major quality deviation.At least once a year
E - Reportable violation, toxic release.Several times in the lifecycle of a project.
D - High repair cost ($25,000.00 and above)Has happened frequently in similar circumstances
Greater than 50% chance of occurring.
MEDIUMSERIOUS / MINORREASONABLY PROBABLE / REMOTE
1C, 2C, 3A, 3BS - Medical AidInfrequent Event
P - Short duration loss of function, serious quality deviation, medium business impactMay only happen occasionally (less than once a year)
E - Minor spill, non-toxic releaseHas been observed in similar circumstances
D - Moderate repair cost ($2,500.00 - $25,000.00)10% - 50% chance of occurring
LOWMINOR / NOT APPLICABLEREMOTE / EXTREMELY REMOTE
1D, 2D, 3D, 4A, 4B, 4C, 4DS - First aid and incident with no treatmentUnlikely event
P - Brief interruption or minor quality deviationNever happened to date
E - Minor leak, non-toxic fugitive emissionsMay happen less than once in 10 years
D - Low repair costs ($2,500.00 and below)Has never been observed but is still felt to be a possibility
Less than 10% chance of happening